olmostower
  • Home
  • About
  • Units Available
  • Owner Page
    • Contact Info
    • Owners/Residents Directory
    • Guest Room Calendar
    • HOA Board Mtg Minutes
    • Projects >
      • Fitness Ctr
      • Landscaping
      • Guest Rooms
      • Elevators
      • Roofs
      • Pool
      • Lobby Renovation
      • Common Space
    • Updates/Information >
      • Fire Alam Instructions
    • Annual Mtg
    • Governing Documents >
      • Owners Insurance
    • Renovation and Contractor Information
    • Realtor Documents
    • New OT Owners
    • Sprinkler Ordinance
    • Archives
    • Contractor List
    • Rental Values
    • Construction Govern
    • Hallways
  • Contact Us
    • SA Mayor Race 2025
  • Guestrooms
Documents for the 15th Floor Hall Ceiling Spalling - 2022
Spring 2022.  A1 Engineering inspected some spalling in the 15th floor hallway ceiling discovered when we opened up the ceiling for our fire sprinkler installation.  A1 set up some crack meters and recommended as a first step that OT properly seal the Mechanical Room (directly above the 15th floor, also referred to as the Penthouse) from all water seepage.

Summer 2022.  
- Drip Pan. New floor drip pan was installed under the water softener. Water softener salt no longer stored in mechanical room.
- Mechanical Room Floor.  Winco removed all loose concrete around all exposed rebar. All exposed rebar was cleaned and a rust inhibitor was applied to the rebar. New concrete was then put on top of the exposed rebar to level the surface. Once those repairs were completed, Winco applied a two step epoxy coating (a Primer of - Nova Tuff 505 and Top Coat of Nova Tuff FC20) to the Mechanical Room Floor. 
- Outer Door.  A new mechanical room to rooftop access door was installed to mitigate water seepage from high winds.
December 2022.  A1 Engineering Reports:
- A1 Assessment Report:
21-7102_700_e_hildebrand_engineers_assessment_12.14.22.pdf
File Size: 1232 kb
File Type: pdf
Download File

- Images and Original OT Structural and Architectural Plans - Click HERE to download from Drop Box.

Additional Historical Information

2003-2005

Cutler-Gallaway Services. In 2003 Cutler produced the following attached report with remediation recommendation for the Mechanical room floor/15th floor ceiling.  In 2005 the work was completed.
ot_2003_report.pdf
File Size: 3315 kb
File Type: pdf
Download File

HOME           CONTACT US
700 East Hildebrand
​San Antonio, Texas  78212
   ​ (210) 824-6661
  • Home
  • About
  • Units Available
  • Owner Page
    • Contact Info
    • Owners/Residents Directory
    • Guest Room Calendar
    • HOA Board Mtg Minutes
    • Projects >
      • Fitness Ctr
      • Landscaping
      • Guest Rooms
      • Elevators
      • Roofs
      • Pool
      • Lobby Renovation
      • Common Space
    • Updates/Information >
      • Fire Alam Instructions
    • Annual Mtg
    • Governing Documents >
      • Owners Insurance
    • Renovation and Contractor Information
    • Realtor Documents
    • New OT Owners
    • Sprinkler Ordinance
    • Archives
    • Contractor List
    • Rental Values
    • Construction Govern
    • Hallways
  • Contact Us
    • SA Mayor Race 2025
  • Guestrooms