olmostower
  • Home
  • About
  • Units Available
  • Owner Page
    • Contact Info
    • Owners/Residents Directory
    • 2021 Annual Mtg
    • Guest Room Calendar
    • Projects >
      • Roof
      • Pool
    • HOA Board Mtg Minutes
    • Updates/Information >
      • Fire Alam Instructions
    • Governing Documents
    • Contractor List
    • Renovation and Contractor Information
    • Realtor Documents
    • New OT Owners
    • Ballot 2020 Loan
    • Sprinkler Ordinance
    • Archives
    • Lobby Renovation
    • Rental Values
  • Contact Us
  • OT Covid-19

Pool Resurfacing, Coping and
Deck Replacement  
​(Updated April 9, 2021)

Roof Project
Back to Projects
The pool/deck/coping resurfacing/replacement project is underway and will finish by Mid-April 2021.
Note - With the ice storm weather problems that caused plaster delivery issues, our pool restoration project was delayed.  A new issue arose on Thursday (4/8) when their new plaster truck developed a hydraulic leak.  Waterworks is adjusting their schedules to free up other plaster equipment.  The pool resurface and punch list items are now looking like a completion date sometime in April. The grass around the pool area will be maintained with watering and thinning out and may not look great immediately, but will improve each week. 
The board chose Waterworks for this project.   Waterworks offered the best warranty (15 years) and they expertise for all three surface areas.   Our pool was constructed very well and to code in the mid 1960s.  Now it is being brought into current code in all areas to include electrical, gas, and safety features.  

As noted in the November 12, 2020 HOA Board Meeting minutes, the initial focus was only on the surface area of the pool and not the coping or deck.  However, it became obvious as many discussions took place it was prudent for safety, aesthetics, and future cost avoidance to fix the coping and deck at the same time as the pool surface.  During deck excavation it was discovered that much of the electrical, gas, and water/pump piping was approaching a point in time that they would need extensive and intrusive maintenance;  Thus, as shown in some of the images below, this issue is being addressed now to avoid future additional costs.
Existing Pool and Deck
Picture
Picture
Picture
Picture
Work in Progress 
Picture
Picture
Picture
French drains.
Picture
Picture
Picture
New pipes all the way to the pump.
Picture
Picture
Picture
Mike inspecting the work.
Picture
Code - Railings added to all 4 corners.
Picture
Picture
Safer surface installed.

Replacing the gas line to the pool heater/cabana;  Replace it now, rather than in a few years from now.
Picture
Picture

Rendering.  
Picture
The image shows how we are easily adding a lounging area at both ends of the pool.

​The attached pdf shows the finishes.  Note: the photos in the pdf do not depict the exact color but give a good idea of what the surfaces will look like.  The surfaces will match the tile in the cabana area.
waterworks_selections_12.21.20.pdf
File Size: 2055 kb
File Type: pdf
Download File


HOME           CONTACT US
700 East Hildebrand
​San Antonio, Texas  78212
   ​ (210) 824-6661
  • Home
  • About
  • Units Available
  • Owner Page
    • Contact Info
    • Owners/Residents Directory
    • 2021 Annual Mtg
    • Guest Room Calendar
    • Projects >
      • Roof
      • Pool
    • HOA Board Mtg Minutes
    • Updates/Information >
      • Fire Alam Instructions
    • Governing Documents
    • Contractor List
    • Renovation and Contractor Information
    • Realtor Documents
    • New OT Owners
    • Ballot 2020 Loan
    • Sprinkler Ordinance
    • Archives
    • Lobby Renovation
    • Rental Values
  • Contact Us
  • OT Covid-19